Information | |
---|---|
has gloss | eng: Warsaw cross-city line is a 7 km railway line crossing downtown Warsaw in the East-West direction. Opened in 1933 and electrified in 1936, it initially had two tracks, with additional two added in 1949. The central part of the line is in a tunnel (2310 m long); it crosses the Vistula by a bridge (445 m) located between Poniatowski Bridge and Świętokrzyski Bridge. |
lexicalization | eng: Warsaw Cross-City Line |
instance of | c/Railway lines in Poland |
Meaning | |
---|---|
Polish | |
has gloss | pol: kolej średnicowa w Warszawie składa się z dwóch linii kolejowych (po 2 tory każda) łączących węzłowe dworce Warszawa Wschodnia i Warszawa Zachodnia. |
lexicalization | pol: Kolej Średnicowa w Warszawie |
Media | |
---|---|
media:img | PKP Powisle dolny budynek 2007.jpg |
media:img | PL Warsaw linia srednicowa Kruczkowskiego.jpg |
media:img | Srednicowa.jpg |
Lexvo © 2008-2025 Gerard de Melo. Contact Legal Information / Imprint